Our Factory — Pipe Fittings Manufacturing in Beijing, China

Our Factory — Pipe Fittings Manufacturing in Beijing, China

PipingFitting.com is the export brand of Beijing AiPu Technology Co., Ltd., a manufacturer of carbon steel, stainless steel and alloy steel pipe fittings – elbows, tees, reducers, flanges, caps and pressure vessel heads – supplying industrial piping projects worldwide under ASME, ANSI, DIN, EN, JIS and GB standards.

Where Our Factory Is Located

Our production base sits in Mengcun Fulin Industrial Zone, Beijing, China – the heartland of China’s pipe fitting industry. Mengcun county has supplied forged fittings to domestic and export projects for decades, giving us a deep local supply chain of forging, heat treatment, machining and testing partners within minutes of our workshop. Our sales office is in Fangshan District, Beijing, about an hour away.

Production Capabilities

  • Sizes: 3/8″ – 160″, DN10 – DN4000
  • Pressure: PN2.5 – PN400, Class 150 – 2500
  • Processes: hot forging, induction bending, CNC machining, threading
  • Materials: A105, A350 LF2, A182 F304/F304L/F316/F316L, alloy steels, duplex on request
  • Facing: FF, RF, MFM, TG, RJ machined in-house

Inside The Workshop

Weld neck flange forging

Forging & flange production – finished WN flanges after forging and heat treatment

CNC machining

CNC machining – flange faces and seal surfaces milled to spec

CNC lathe workshop

CNC lathe workshop – elbows, tees and reducers machined in batch

Induction bending machine

Induction bend line – hot forming of large bends

Painting line

Painting line – surface coating before packing

Paint drying oven

Drying oven – from painting to packing in about 40 minutes

Flange stock yard

Stock yard – carbon steel flanges ready for immediate shipment

Export packaging

Export packaging – plywood cases and pallets, seaworthy packing

Finished goods warehouse

Warehouse – packed orders staged for dispatch

Quality Control

Every order passes dimensional inspection, material verification and marking checks before packing. PMI, hardness and mechanical testing are performed with certified partner laboratories; EN 10204 3.1 mill test certificates ship with every order, 3.2 available on request.

Packing & Delivery

Fittings are coated, dried and packed in export plywood cases or pallets – the whole finishing process from painting to packing takes about 40 minutes per batch, keeping lead times short. Standard items ship from stock; custom sizes typically ship in 15-30 days depending on quantity.

Visit Us

Factory: Hebei Beijing Mengcun Fulin Industrial Zone · Office: 4th Floor, Building 1, No.85 Hong’an Road, Fangshan District, Beijing. Factory visits are welcome – contact us to arrange one, or request photos and video of your order in production.

How to audit a pipe fittings factory

A fittings factory is judged on process control rather than on the size of its building. The sequence below follows the material from incoming steel to packed export case, and each stage has a specific control point that either exists or does not.

StageControl pointWhat a weak factory looks like
Incoming materialHeat number recorded, certificate matched to the physical pipe or plateCertificates on file that cannot be linked to stock
CuttingLength and end squareness within toleranceNo measurement record before forming
Heating and formingTemperature control during hot forming or cold forming with controlled strainForming temperature judged by eye
Heat treatmentFurnace chart per batch, holding temperature and time recordedNo chart, or one chart reused for several batches
Machining and end prepBevel angle and face dimensions checked against the standardEnds prepared by hand with no gauge
InspectionDimensional, PMI, hardness, hydrostatic or NDT as specifiedVisual inspection only, described as full inspection
Marking and packingHeat number, size and standard marked on the part and on the caseParts mixed between heats in one case

The five questions that reveal the most in a factory visit

  1. Show me the heat number on this part, and the certificate for that heat.
  2. Which furnace treated this batch, and where is its chart?
  3. What is your dimensional check frequency, and where is the record?
  4. Who signs the inspection release, and are they independent of production?
  5. How do you segregate two grades in the same packing case?

None of these require laboratory equipment to ask. The answers separate a controlled process from an uncontrolled one faster than any equipment list.

Frequently asked questions

Does a large machine list prove capability?

Only partly. A machine proves the size range that can be formed; it says nothing about heat treatment control, inspection discipline or traceability, which are what determine whether the delivered fitting matches the certificate.

Why does heat treatment matter for carbon steel fittings?

Hot forming and welding change the microstructure. Heat treatment restores the specified properties, and without a recorded chart there is no evidence that it happened within the required window.

Page last updated: . First published: . Publisher: PipingFitting.