Alloy Steel (Chrome-Moly) Pipe Fittings: WP5, WP9, WP11, WP22, WP91
Chrome-moly fittings carry steam, hydrogen and hydrocarbon streams at temperatures and pressures where carbon steel would creep or oxidise. We manufacture fittings to ASTM A234 in WP5, WP9, WP11, WP22 and WP91, dimensionally to ASME B16.9, and match the grade to the design temperature and the piping specification.
Grades and properties
| Grade | Nominal composition | C max | Cr | Mo | Other | Tensile min | Yield min | Typical service |
|---|---|---|---|---|---|---|---|---|
| WP5 | 4-6% Cr | 0.15 | 4.0-6.0 | 0.45-0.65 | – | 415-585 MPa | 205 MPa | Up to ~540°C, oxidising service |
| WP9 | 9% Cr | 0.15 | 8.0-10.0 | 0.90-1.10 | – | 415-585 MPa | 205 MPa | Up to ~600°C |
| WP11 | 1.25% Cr – 0.5% Mo | 0.05-0.15 | 1.00-1.50 | 0.44-0.65 | – | 415-585 MPa | 205 MPa | Refinery and steam lines to ~540°C |
| WP22 | 2.25% Cr – 1% Mo | 0.05-0.15 | 2.00-2.50 | 0.87-1.13 | – | 415-585 MPa | 205 MPa | Hydroprocessing, high temperature steam |
| WP91 | 9% Cr – 1% Mo – V-Nb | 0.08-0.12 | 8.00-9.50 | 0.85-1.05 | V 0.18-0.25, Nb 0.06-0.10, N 0.03-0.07 | 585 MPa | 415 MPa | Advanced steam, modem power plant |
Why the grade matters more than the size
In high temperature service the fitting must be the same grade as the pipe it joins. A WP11 pipe welded to a WP22 fitting creates a dissimilar joint with a different creep behaviour at the weld, and that joint becomes the life-limiting detail of the line. Send the piping specification and the design temperature, not just the dimensions.
Manufacturing and heat treatment
- Wrought fittings formed from pipe or forged from bar stock, then heat treated to suit the grade and section
- WP91 needs normalising and tempering within a controlled window – we confirm the heat treatment cycle on the certificate
- Hardness testing on each heat is standard practice for WP91 and for sour service requirements (NACE MR0175 / ISO 15156 on request)
- Post-weld heat treatment is the buyer’s fabrication step; we supply the recommended PWHT parameters with the documents
Applications
- Refinery hydroprocessing, hydrocracking and reformer lines
- Power plant high pressure and high temperature steam piping
- FCC and coker units with erosive and high temperature conditions
- Petrochemical furnaces and transfer lines
- Boiler and heat recovery steam generator (HRSG) connections
Custom sizes, grades and marking
- We make these fittings to order rather than only from a catalogue: non-standard sizes, heavier wall, special centre-to-end dimensions and prepared ends to the drawing.
- Marking and documentation are agreed at the quotation stage – heat number, size and schedule stamps, your own brand mark, and EN 10204 3.1 mill test certificates with the shipment.
- Where a project needs a grade that is not held in stock, tell us the service condition and the applicable standard; we will confirm what can be produced and the lead time before the order is placed.
Frequently asked questions
Do you supply WP91 with impact testing?
Yes – Charpy tests can be specified on the purchase order, together with the test temperature and acceptance criteria. Report the requirement with the inquiry so the test pieces can be taken from the same heat.
Can these grades be supplied for sour service?
For H2S-containing service the fittings are supplied to NACE MR0175 / ISO 15156 with hardness control and the applicable heat treatment. State the sour service requirement on the order – it changes material selection and testing.
Which standards are used for dimensioning?
Butt weld fittings to ASME B16.9, flanges to ASME B16.5 or B16.47, forged fittings to ASME B16.11. European projects may specify EN 10253 or DIN dimensions instead; send the standard with the inquiry.
Send the grade, design temperature and the piping specification – we will confirm the heat treatment and certification route. Send the specification for a quotation · info@pipingfitting.com