EN 10204 3.1 Mill Test Certificate | Pipe Fittings Documentation

EN 10204 3.1 Mill Test Certificate for Pipe Fittings

The material certificate is the document that proves the fitting is what the specification asked for. Most buyers ask for “a certificate” without saying which type, and the difference between a 2.2 test report and a 3.1 certificate is the difference between a promise and a test result issued by the steelmaker.

Certificate types

Type Issued by Contains Use
EN 10204 2.2 The manufacturer, non-specific inspection Test results based on the manufacturer’s own inspection, not tied to the delivered heat Non-pressure, general service only
EN 10204 3.1 The manufacturer, specific inspection, validated by the mill’s independent inspection representative Actual test results for the heat and the items delivered, with heat traceability The normal requirement for pressure piping
EN 10204 3.2 A nominated third party or independent inspector As 3.1, plus witnessed and signed by the third party Where the project or code requires independent witnessing

What a 3.1 certificate should show

  • Standard, grade and the heat number of the material
  • Chemical composition with the actual values, not only the specification limits
  • Mechanical properties: tensile, yield, elongation, and impact results where required
  • Heat treatment condition (as forged, normalised, solution annealed)
  • Product form, size and quantity covered by the certificate
  • The signature of the mill’s authorised inspection representative and a position that identifies it

Checks on receipt

Marking on the fitting must match the heat number on the certificate – if they differ, the traceability chain is broken. Check the impact test temperature against the design metal temperature, the grade designation against the purchase order, and the quantity covered against the packing list. Photograph the marking on arrival: it is the first thing that becomes unreadable after handling and storage.

Additional reports that are often specified

Report What it adds
PMI (positive material identification) Confirms the alloy on the finished item, catching grade substitution after the mill
Hardness survey Required for sour service and hydrogen service, and across welds
Dimensional report Measured values against the standard, item by item
Impact test Toughness at the design metal temperature
Corrosion test (ASTM A923 / G48) Duplex and stainless suitability for the service
Third party inspection report Independent witness for the buyer or the end user

Frequently asked questions

Is a 3.1 certificate the same as a test report?

No. A test report (2.2) may quote typical or specification values; a 3.1 certificate carries the actual results for the delivered heat, validated by the mill’s inspection representative.

Can you supply 3.2 certification?

Yes, where a nominated third party is appointed to witness and stamp the documents. Tell us who the inspector will be so it can be coordinated with production.

What happens if the marking and the certificate do not match?

The traceability chain is broken and the item should be treated as unverified – that is exactly the situation the 3.1 system is designed to prevent, and it is a legitimate reason to reject the shipment.

Tell us the certification and test reports your project needs – they will be included in the quotation. Request a quotation · info@pipingfitting.com